Belgium High-speed rail in Europe




high-speed rail network in belgium


belgium s rail network served 4 high-speed train operators: thalys, eurostar, ice , tgv trains. of them serve brussels south (midi) station, belgium s largest railway station. thalys trains, variant of french tgv, operate between belgium, germany (dortmund), netherlands (amsterdam) , france (paris). since 2007, eurostar has connected brussels london st pancras, before which, trains connected london waterloo. german ice operates between brussels, liège , frankfurt hbf.


the hsl 1 belgian high-speed railway line connects brussels french border. 88 km long (71 km dedicated high-speed tracks, 17 km modernised lines), began service on 14 december 1997. line has appreciably shortened rail journeys, journey paris brussels taking 1:22. in combination lgv nord, has affected international journeys france , london, ensuring high-speed through-running eurostar, tgv, thalys pba , thalys pbka trainsets. total construction cost €1.42 billion.


the hsl 2 belgian high-speed rail line between brussels , liège, 95 km long (61 km dedicated high-speed tracks between leuven , ans, 34 km modernised lines between brussels , leuven , between ans , liège) began service on 15 december 2002. extension german border (the hsl 3) in use, combined high-speed line accelerates journeys between brussels, paris , germany. hsl 2 used thalys , ice trains fast internal intercity services.


the hsl 3 belgian high-speed railway line connects liège german border. 56 km long (42 km dedicated high-speed tracks, 14 km modernised lines), began service on 13 december 2009. hsl 3 used international thalys , ice trains only, opposed hsl 2 used fast internal intercity services.


the hsl 4 belgian high-speed railway line connects brussels dutch border. 87 km long (40 km dedicated high-speed tracks, 57 km modernised lines). hsl 4 used thalys trains since 13 december 2009 , used starting 2010 fast internal intercity trains. between brussels , antwerp (47 km), trains travel @ 160 km/h on upgraded existing line (with exception of few segments speed limit of 120 km/h imposed). @ e19/a12 motorway junction, trains leave regular line run on new dedicated high-speed tracks dutch border (40 km) @ 300 km/h.


the completion of channel tunnel rail link (high speed 1) , completion of lines brussels amsterdam , cologne led news reports in november 2007 both eurostar , deutsche bahn pursuing direct services london amsterdam , cologne. both journeys under 4 hours, length considered competitive air travel.







Comments

Popular posts from this blog

Camerini.27s algorithm for undirected graphs Minimum bottleneck spanning tree

Discography Anthony Phillips

Roads and bridges List of places named for Douglas MacArthur